Hot Water Boilers
admin2022-05-01T20:47:42+00:00
| PROJECT |
LOCATION |
CAPACITY |
FUEL |
| 1 |
ADALYA TARIM |
ANTALYA |
4.000.000 Kcal/h |
COAL |
| 2 |
AGRION TARIM |
ANTALYA |
2 x 3.000.000 Kcal/h |
COAL |
| 3 |
AKTÜL KAĞIT |
SAKARYA |
1.350.000 Kcal / h |
WASTE HEAT |
| 4 |
AKTÜL KAĞIT |
SAKARYA |
1.500.000 Kcal / h |
WASTE HEAT |
| 5 |
ANTALYA FİDE |
ANTALYA |
5.000.000 Kcal/h |
COAL |
| 6 |
ANTALYA TARIM |
ANTALYA |
4.000.000 Kcal/h |
COAL |
| 7 |
ÇUKUROVA FİDE |
MERSİN |
3.000.000 Kcal/h |
COAL |
| 8 |
DEKOR AHŞAP (LINEADECOR) |
ISTANBUL |
2.500.000 Kcal/h |
COAL |
| 9 |
DESİBEL |
KAYSERİ |
2.000.000 Kcal/h |
NATURAL GAS |
| 10 |
EGE FİDE |
İZMİR |
2 x 2.750.000 Kcal/h |
NATURAL GAS |
| 11 |
GÖKKALE TARIM |
AYDIN |
2 x 4.000.000 Kcal/h |
COAL |
| 12 |
GÖKKALE TARIM |
AYDIN |
8.000.000 Kcal/h |
COAL |
| 13 |
GÜNEY FİDE |
ANTALYA |
4.000.000 Kcal/h |
COAL |
| 14 |
HISHTIL TOROS |
ANTALYA |
5.000.000 Kcal/h |
COAL |
| 15 |
ILGAZ TURİZM |
KASTAMONU |
2.000.000 Kcal/h |
COAL |
| 16 |
LİDER GIDA |
MANİSA |
8.000.000 Kcal/h |
COAL |
| 17 |
ÖZALTIN SERACILIK |
ANTALYA |
8.000.000 Kcal/h |
COAL |
| 18 |
SAROT TERMAL |
BOLU |
5.000.000 Kcal/h |
COAL |
| 19 |
SEL TURİZM |
AYDIN |
6.000.000 Kcal/h |
COAL |
| 20 |
SEZER ZİRAAT |
MERSİN |
6.000.000 Kcal/h |
COAL |
| 21 |
SİDAR TURİZM |
ANTALYA |
8.000.000 Kcal/h |
KÖMÜR |
| 22 |
SÜRAL TURİZM |
ANTALYA |
2 x 3.000.000 Kcal/h |
KÖMÜR |
| 23 |
SÜRAL OTELCİLİK |
ANTALYA |
4 x 5.000.000 Kcal/h |
KÖMÜR |
| 24 |
SÜRAL OTELCİLİK |
ANTALYA |
8.000.000 Kcal/h |
KÖMÜR |
| 25 |
KİLİM MOBİLYA |
KAYSERİ |
2 x 2.000.000 Kcal/h |
KÖMÜR |
| 26 |
TAN CHOICE / TANZANYA |
TANZANYA |
300.000 Kcal/h |
KÖMÜR |
| 27 |
TOSUNOĞULLARI MOBİLYA |
KONYA |
4.000.000 Kcal/h |
KÖMÜR |